Powered by GadBall

Eric Olenick

213 East 13th Ave., Unit A Anchorage, AK 99501 (907) 770-1477

Objective

OBJECTIVE: To find a position in a company that will utilize my 20 plus years of experience in the field of Petrochemical Piping Design, Plant Layout, North Slope pipe design, field experience, management, checking and related Cad driven task.

Work Experience

Principal Piping Designer

CH2M January 2009 - June 2009 (5 months)
Producing Fabrication Spool Drawings from issued isometrics from various
engineering companies and assisting the QC department with logging heat numbers
and weld IDs.


Principal Piping Designer

CH2M August 2007 - January 2009 (1 year 5 months)
previously VECO)
Lead Piping Designer on BP WOA-MOWF ULSD TERMINAL project. Responsible for the design and layout of a new Truck Terminal Loading Area with pump skid to accommodate the loading and unloading of tankers trucks bringing ULSD to and taking ULSD from the MOWF area for storage and use in the Prudhoe Bay area.
Piping Designer for the internal piping and fuel dispensers of the four fueling modules associated with the BP WOA-MOWF FUEL DISPENSING ISLAND PROJECT


Principal Piping Designer/Checker

VECO Alaska, Inc May 2006 - August 2007 (1 year 3 months)
Lead Piping Designer on BP Northstar Vapor Recovery Project. Responsible for the
design and layout of the new Vapor Recovery System for the existing Water Surge and the Well Clean Up Tanks located at the Northstar facility on the North Slope.
Lead Piping Designer on BP L1 to LPC Pipeline Replacement Project with Smart Pig
Launcher Module and Corrosion Inhibitor Tank and Pumps at L1 and Smart Pig
Receiver at LPC.
Worked as Piping Designer and Checker on the BP BRT (Business Resumption
Team) to design replacement piping and jump-overs to get BP's Prudhoe Bay
Pipelines back into service after lastest spill and shutdown of Prudhoe Bay


Design Specialist

Fluor Operations September 2002 - May 2006 (3 years 8 months)


Designer/Checker on Operations and Maintenance Pro

Flint Hills Resources


Turnaround Coordinator on site

Chevron Texaco Refinery in


Design Specialist

Fluor Operations February 2002 - September 2002 (7 months)
Designer/Checker on Polymer Modified Asphalt Project for Valero Refining
Company


Senior Piping Designer

VECO ALASKA, INC January 2001 - Present (8 years 10 months)
Lead Piping Designer / Checker on BP Northstar Project. Made numerous trips to
North Slope field site for construction support during module installation and
Northstar start-up.


2000 Cad Operator, CAD TECHNOLOGY

EL PASO ENERGY
Worked in the Compliance Services Group identifying dead ends, low points and low flow areas in pipelines and compressor stations where fluids collect and cause corrosion problems.


2000 Cad Operator

Gullet and Associates
Revised Pipeline Alignment drawings using Microstation


Senior Piping Designer

Fluor Daniel Engineering January 1989 - January 2000 (11 years)
Worked in the Piping department developing Auto Cad and Microstation piping layout drawings for fabrication and installation into numerous Petrochemical refineries. Most of my time was spent in the field at refining sites working directly with construction and refinery personnel during revamps and plant turnarounds. Worked as a Checker and Back-checker. Taught beginning Auto Cad, and worked in the Auto Cad support group..



Education

Bee County College


A.A.S - Drafting, and Design

Texas Tech University


- Architecture